
|

Camp
Blue Diamond Inc.
Building Projects
Several building
projects, like the new Lakeside Cabin located across from the lake's
spillway, are underway at Camp Blue Diamond, these include:
- Finishing siding, and porch
railings on the Rising Sun Cabin
Electrical, plumbing and
inside Construction of the new Lakeside
Laying new decking for
Stage Floor
Currently skilled and
not-so-skilled volunteers are
needed for construction jobs. Anyone wishing to help should call
a few days prior, so Paul can get the necessary supplies. We'll provide
lunch.
|
|
New
Family/Small Group
Cabins- Lakeside & Rising Sun
Each new cabin will
have over 1500 sq. feet, and can accommodate twelve guests easily. When
completed the two side-by-side cabins could be used jointly by a
larger rental group (up to 24 guests). Each cabin has a kitchen, dining/living room,
three bedrooms, a loft, two bathrooms, TV/VCR/DVD, central heat and air,
frig, oven, microwave and dishwasher. They will be handicapped
accessible. Rising Sun Cabin
is ready for rentals, Lakeside is scheduled for completion in Fall 2008. Please call CBD (814) 667-2355 or email
for information. |
|

Old
Rising Sun Cabin Demolished
With the help of the backhoe,
Paul and a large group of volunteers from the Martinsburg Memorial Church of the
Brethren demolished the Old Rising Sun cabin. The new Rising Sun and Lakeside
cabins will sit to the right and left of the former cabin. A parking lot
for the two new cabins will sit where the old Rising Sun used to be.
|
|
New Staff Duplex
The new staff building will
be a duplex where the Program Director can live year round, and the
Facility Director and family can live during the summer. The building will
have two identical floors with two bedrooms, a kitchen/living room, and
bathroom laundry on each floor. It will be located across from the
office, where the staff trailer is presently. Construction will hopefully
begin in late 2008 or early 2009.
|
|